Common Facility Centre (CFC) Scheme
The Government of India under the Ministry of Textiles has proposed various incentive schemes and subsidies for the development and upgradation of the power loom sector. One such scheme is Common Facility Centre (CFC) Scheme which was developed to provide financial assistance for setting up of Common Facility Centers in the power loom cluster. In this article, we look at the Common Facility Centre (CFC) Scheme in detail. Also, read about In-Situ Upgradation Scheme for Plain Power LoomsObjectives of the Scheme
The objectives of the Common Facility Centre (CFC) are given below:- To establish Common Facility Centres (CFC) in various Powerloom clusters
- To provide pre-weaving, post weaving and other infrastructure facilities to Powerloom units, power loom weavers, power loom industry associations and other organizations allied with Powerloom industry.
Eligibility Criteria
The following are the eligibility criteria required to apply for the CFC scheme:- It is necessary to form a Special Purpose Vehicle (SPV) with a minimum of 11 members required to apply for the CFC scheme.
- The Members of SPV should be Powerloom Weavers, Master Weavers, Co-operative Societies, Private Entrepreneurs, NGO’s working for Powerloom Sector.
- The SPV registered under Companies Act, Co-operative societies, a trust, Limited Liabilities Partnership (LLP) Act, State Government/State Government Agencies are eligible for establishment CFC under the Scheme.
- The SPV should possess their own Land/Building (or) Leased Land/Building registered in favour of SPV for a minimum period of 10 Years.
Operational Period
Common Facility Centre Scheme (CFC) for Powerloom Clusters under PowerTex India will be in operation from 01 April 2017 to 31st March 2020 on pan India basis.Operation of SPV
- In addition to the members of the SPV, the organizers should obtain written commitments from the users of the proposed facility so that its benefits can be further enlarged.
- The SPV must have a democratic constitution with an inbuilt scope for increasing the membership, including individual entrepreneurs or power loom weavers in future.
- The SPV is required to interact with the weavers and tie-up with the connected organizations like financial institutions, banks, market experts/market institutions, marketers, legal experts, Government machinery etc.
- •The SPV will prepare project report for setting up of the Common Facilities Centre/yarn depot, infrastructure etc. specifying the annual action plans and indicating the requirement of the cluster, activities and expected outputs, outcomes/deliverables time limit for completion of the projects.
- The SPV is required to send the proposal in the prescribed formats along with documents enlisted in the checklist to the concerned Regional Office of the Textile Commissioner.
- The Regional Office of the Textile Commissioner will examine the proposal and forward the same to the Office of the Textile Commissioner along with their recommendation within 30 days of the receipt of the proposal.
- The Office of the Textile Commissioner will further verify the proposal and place the same before the Project Approval Committee (PAC) within 60 days of the receipt of the proposal from the concerned Regional Office of the Textile Commissioner.
- The SPV will also submit physical and financial progress report periodically and also, completion report to the Textile Commissioner.
- After completion of the projects, the SPV will continue as a consortium for the power loom weavers to run and maintain the common facilities/infrastructure.
- The SPV is not supposed to charge the non-SPV members more than 20% of the charges they charge to their own SPV members towards the usage of Common Facility Centres since the Government of India subsidy is provided for the establishment of CFC.
Other Conditions
- The proposals/projects more than one in a single cluster are allowed as per the requirement of the cluster without restricting the maximum subsidy limit per CFC. However, the SPVs of CFCs will not have any common Director, i.e., Director of one particular SPV of a CFC will not be a Director of any other SPV of CFC.
- Owned Land/Building, Leased land/Building registered in favour of SPV for a minimum period of 10 Years is to be arranged by SPV before submitting the proposal for financial assistance from Government.
- A minimum of 11 members is needed to form an SPV.
- In case of any change in a project profile, the approval of PAC is to be obtained.
- Only TUF compatible machinery are eligible to install in the CFC.
- In case of non-utilization of subsidy and delay in completion of the project, as approved by PAC, funds released would be recovered from the Executive Agency with simple interest at the rate of 10% per annum and the decision of PAC will be the final.
Eligible Machines & Equipments
Common Facility Centre will include studio/design centre, testing facilities, training centre, information cum trade centre and common raw material/yarn/sales depot, water treatment plant for industrial use, the dormitory for workers/worker’s residential place, common pre-weaving facilities viz. Yarn dyeing, Warping & Sizing, Twisting etc. and post weaving facilities viz. Processing etc. Also, there can be other tangible assets that would be set up in clusters, as long as they are put to common use by decentralized power loom units in and around the cluster.Quantum of Subsidy
The assistance given by the Government for Common Facility Centers are tabulated below:| S. No | Project Cost | Scale of Assistance |
| 1. | Machinery, plant, equipment, laboratory, other tangible assets, pre-operative/preliminary expenses, etc. | Rs.2.00 core |
| 2. | Construction of Building | Rs.0.40 crore |